Case Study: Leveraging Designer-Contractor-Manufacturer Collaboration in Evaluating Prefabrication Solutions to Ease Project Delivery

Time: 2:10 pm
day: Day Two

Details:

  • Reviewing the criteria for early evaluation of a prefabrication solution between the designer, contractor, and manufacturer
  • Understanding how to get buy-in from the owner on the selected prefabrication solution as opposed to a traditional option
  • Learning how the contractor and manufacturer can inform the design process for effective integration of prefabrication

Speakers: